[Bug localedata/11139] New: Weekday/workday should starts with monday in et_EE
aurelien at aurel32 dot net
sourceware-bugzilla@sourceware.org
Tue Jan 5 16:14:00 GMT 2010
As in most western countries, the first weekday/workday should be a monday in
the et_EE locales. Patch to fix that will follow.
--
Summary: Weekday/workday should starts with monday in et_EE
Product: glibc
Version: unspecified
Status: NEW
Severity: normal
Priority: P2
Component: localedata
AssignedTo: libc-locales at sources dot redhat dot com
ReportedBy: aurelien at aurel32 dot net
CC: glibc-bugs at sources dot redhat dot com
GCC build triplet: x86_64-unknown-linux-gnu
GCC host triplet: x86_64-unknown-linux-gnu
GCC target triplet: x86_64-unknown-linux-gnu
http://sourceware.org/bugzilla/show_bug.cgi?id=11139
------- You are receiving this mail because: -------
You are the assignee for the bug, or are watching the assignee.
More information about the Libc-locales
mailing list