[Bug build/19813] Failure when cross-testing using cross-test-ssh.sh
joseph at codesourcery dot com
sourceware-bugzilla@sourceware.org
Tue Mar 15 16:08:00 GMT 2016
https://sourceware.org/bugzilla/show_bug.cgi?id=19813
--- Comment #8 from joseph at codesourcery dot com <joseph at codesourcery dot com> ---
On Tue, 15 Mar 2016, martin.galvan at tallertechnologies dot com wrote:
> Odd. I was using the 2.23 release from http://ftp.gnu.org/gnu/libc/; I thought
> it would stay in sync with the 2.23 branch. In any case, I'll test it with
> master and let you know what happens. Thanks.
A release tarball should always be a fixed byte sequence; it should never
change after release. glibc doesn't do point releases, such as 2.23.1, at
present.
--
You are receiving this mail because:
You are on the CC list for the bug.
More information about the Glibc-bugs
mailing list